The Issue

At this early stage, the assessment required the review of all the documentation provided by the lessor, including the Letter of Intent (LOI) / lease contract and a records review of the aircraft and engines. The airline wished to understand the cost implications of the aircraft during the lease when the redelivery conditions and the condition of the aircraft were taken into account.

The TGIS Aviation Solution

With the wealth of experience within the team, TGIS Aviation was able to conduct a full review of the LOI against the anticipated condition of the aircraft and engines at both delivery to the airline and subsequent redelivery back to the lessor at the end of the lease. This review highlighted all areas where there were exposures to costs that could ultimately be avoided through the renegotiation of the redelivery conditions. As the single highest cost exposure to an airline, TGIS Aviation carried out a detailed cost review of each engine taking into account the delivery condition, the anticipated timing of the shop visits during the lease, the workscope to be applied during the shop visits along with LLP replacement and the expected condition of the engine at redelivery.

TGIS Aviation was able to apply costs to the projected events to calculate the overall cost of the engines during operation taking into consideration the requirements of the LOI. The calculations were based on a $ per hour rate for the general engine costs and a $ per cycle value for the LLP costs equalised over hours and cycles flown during the lease. These calculations confirmed the $ per hour, $ per cycle reserves to be paid to the lessor were insufficient to cover the total anticipated costs of an engine at a shop visit, requiring the airline to ‘top up’ the reserve pots.

The reason for these exposures was due to:

  • Restrictive redelivery conditions resulting in an early engine shop visit, for no technical reason, only to meet the terms of the contract.
  • The shortfall in LLP maintenance reserves since the drawdown calculations only included a contribution to the life run and the pro-rata value of the life remaining on the LLP (stub life), which remained the responsibility of the airline.

The versatility of TGIS Aviation’s engine cost models meant that we were able to create various scenarios, adjusting the lease period, the time between engine removal, and redelivery conditions enabling us to advise to identify a situation that minimised these additional costs to the airline.

Outcome for our Client

This exercise highlighted various exposures based on the above reasons. The early handback shop visit and the requirement to pay for the stub life of the LLP resulted in a potential additional cost to the airline of $7.2M across both engines.

Through providing these costs at the LOI stage allowed the airline to renegotiate a reduction of redelivery conditions, resulting in a high potential for the avoidance of the handback shop visit and eliminating the additional costs of $7.2M.

Get In Touch

Facing a time-sensitive project or need a team that can hit the ground running and protect your assets and investments?

Contact us today to discover how we can help your organisation achieve its goals.

Extend Engine Life.
Retain Value.
Focus Where It Matters.
Outcome for our Client
Explore more Case Studies
Etihad Airways – Smarter Engine Fleet Management Decisions with Optima and $100M in identified cost avoidance

Etihad Airways – Smarter Engine Fleet Management Decisions with Optima and $100M in identified cost avoidance

“Optima will act as a single source of truth for technical, planning, and financial decisions—empowering Etihad Airways to navigate the...
Read More
Boeing 737 MAX 8 Redelivery

Boeing 737 MAX 8 Redelivery

At TGIS Aviation, we specialise in supporting clients through time-sensitive and complex aircraft transition projects.
Read More
CargoLogicAir B747 Fleet

CargoLogicAir B747 Fleet

TGIS provided a highly experienced team that not only managed day-to-day tasks but took a proactive role in anticipating challenges....
Read More
Repossession of A320 Aircrafts

Repossession of A320 Aircrafts

Trish Gray, Engine Expert Witness specialist at TGIS Aviation, supported an airline as an independent Expert Witness for a case...
Read More
Rolls-Royce Trent 772B Lease

Rolls-Royce Trent 772B Lease

During lease negotiations on behalf of airline clients, TGIS Aviation was asked to review the operational costs of two Trent...
Read More
IAE V2500 Shop Visit

IAE V2500 Shop Visit

TGIS Aviation was contacted by a Lessor to manage a V2500 shop visit. The engine had been repossessed by the...
Read More
Airline Due Diligence & Valuation

Airline Due Diligence & Valuation

TGIS Aviation recently assisted a start-up airline, which was in the process of selecting up to four aircraft to launch...
Read More
Get in touch.
Let's talk engines.

We’re headquartered in the UK, but our team’s global. We support clients wherever their engines are.

Email us:

info@tgis.aero
Get in Touch
Contact us for more information or if you'd like to discuss anything with a member of our team